  • Maintenance of green areas in the parks, islands, kindergartens, public and coastal areas of Komotini.

The project concerned the maintenance of the green of parks, islets, etc. of specific areas with works such as irrigation, grass cutting, shrub formation, formation of irrigation basins, etc.

  • Reforestation works (Abies cephalonica) in the burnt fir forest of Parnitha National Park in the areas of Goura – Diaselo Panos and Villani.

The purpose of the project was the reforestation works (digging holes, planting, fertilizing, weeding and digging planting holes, watering plants) of the burned fir forest of Parnitha National Park with the ultimate goal of restoring natural vegetation and protecting the soil.

  • Complementary forestry works on the reforestation plants of the year 2010 in the burnt fir forest of Parnitha National Park.

The project concerned the maintenance work on reforestation plants with the main purpose of helping to improve the survival rate of young plants and their greater growth which will result in the restoration of greenery and protection of the soil from erosion which is the necessary natural resource. for the gradual restoration of the final plant community (climax) in the area.

  • Egnatia Odos Motorway: Restoration works of slope parts of the motorway between the city of Igoumenitsa and Arachthos (1.1.2 – 3.1).

The present contract concerned the installation of lawn and the installation and maintenance of greenery on sloping sections of the Egnatia Odos in order to avoid erosion and stabilization of their surfaces, where the surface vegetation had been destroyed.

  • Landscape stabilization works and environmental restoration of slope parts along the new double-track railway between Eleusina and Korinthou in the area of Kinetta – Ag. Theodori (A.Δ.329).

The present contract concerned the execution of plant engineering works and constructions in order to protect from the erosion of the formed ditches, embankments and uneven passages, their stabilization to avoid impending landslides and at the same time their environmental restoration and the improvement of the landscape and the landscape. of the railway line.

  • Planting works on the west entrance of Thessaloniki.

The present project concerned the installation and maintenance of plants as well as the construction of a tertiary irrigation network, in order to restore the disturbed landscape in order to apply the environmental conditions of the Western entrance of Thessaloniki.

  • ΣΠ4/06 Plant maintenance, cleaning of small islands and neighbouring areas of motorways Poseidonos, Sygros and other roads of ΔΚΕΣΟ.

The present project concerned the completion and maintenance of greenery (lawn, plants) on the islets and adjacent areas of Poseidonos and Syggrou Avenues.

  • Horticultural works in the drainage basins of Krystallas (Cluster 76Α) and Dychalas (Section 80) K.A. 14.05.

The project concerned the reforestation of the Poa area - Krystallis.

  • ΣΠ4-08 Maintenance, improvement and installation of plants in the islets of Poseidon routes, Ethnarchou Makariou and other roads of ΔΚΕΣΟ.

The present contract concerned the completion and maintenance of greenery (lawn, plants) on the islets and adjacent areas of Poseidonos Avenue, Ethnarchou Makariou Avenue, the SEF junction and the river Faliro.

  • Maintenance of urban plants of Didymoteicho.

The project concerned the installation and maintenance of plants in order to upgrade the aesthetic quality of the urban environment and the regulation of the quality of the microenvironment in the urban area.

  • Remaining landscape stabilization works and environmental restoration of slope parts along the railway track SKA – Thessaloniki – Strymona (A.Δ. 498).

The present contract concerned the execution of plant engineering works and constructions in order to protect from the erosion of the formed ditches, embankments and uneven passages, their stabilization to avoid impending landslides and at the same time their environmental restoration and the improvement of the landscape and the landscape. of the railway line.

  • Plant technical works for the stabilization and the environmental restoration of the slopes along the Railway Line by the SS. Tithoreas 164 + 000 until CH. 169 + 737 before the entrance of the Kallidromos tunnel and from the exit of the Kallidromos tunnel Χ.Θ. 178 + 924.45 until Χ.Θ. 181 + 645 and Χ.Θ. 197 + 319.26 until Χ.Θ. 202 + 466.26 (Α.Σ. 2501).

The object of the contract in question is the execution of plant engineering works and constructions in order to protect from the erosion of the formed embankments, their stabilization in order to avoid impending erosive phenomena in them and at the same time their environmental restoration and the landscape caused by it. damage from the construction of the railway line and in general the improvement of the aesthetics of the railway line, by S.S. Tithoreas 164 + 000 until CH. 169 + 737 before the entrance of the Kallidromos tunnel and from the exit of the Kallidromos tunnel Χ.Θ. 178 + 924.45 until Χ.Θ. 181 + 645 and Χ.Θ. 197 + 319.26 until Χ.Θ. 202 + 466.26.

  •   Plant technical works for the stabilization and the environmental restoration of the slopes along the Railway Line from the exit of Tunnel Othrios Χ.Θ. 242 + 000 until Χ.Θ. 255 + 305 (Α.Σ. 2504).

The object of the project is the execution of plant engineering works and constructions in order to protect from the erosion of the formed embankments, their stabilization to avoid impending erosive phenomena in them and at the same time their environmental restoration and the landscape from the damage caused by them. construction of the railway line, and in general the improvement of the aesthetics of the railway line, from Line from the exit of the Tunnel Othrios Χ.Θ. 242 + 000 until Χ.Θ. 255 + 305.

  • Contract 88 execution of works for the safe management of the logging residues of extraordinary harvesting of dry and affected trees of Trachea and Halepio Pefki in Section 5 of the Peristatic Forest of Thessaloniki - Lease of two (2) crushing machines.

The project concerned the transport of pine logging residues to adjacent roads, etc. with an average transfer distance of 50 meters (per acre), crushing the residues using two (2) wood crushing machines.

  • Safe management of emergency harvesting residues in the Peristatic Forest of Thessaloniki.
The project concerned the transport of pine logging residues to adjacent roads, etc. with an average transfer distance of 50 meters (per acre), crushing the residues using two (2) wood crushing machines.